American Machine Manufacturer saved 50% cost on Engineering
American Machinery Manufacturer Client Challenge A machinery manufacturer required to show five customized design of an existing machinery and manufacture with in six months. The time frame is two months for Design approval, but they do not have enough engineers to make five designs and it would be costly affair
Read moreCanadian Structural Fabricator Considered Proffer Engineering as Extended Conveyor Design Team
Client Challenge As client got a challenging project to design Conveyor line, Structural design and Detailing. Client do not have a team who can fulfil Conveyor Design task. Client challenge is to find a supplier who has a Structural Design and Conveyor design team. Proffer’s solution Proffer has 20 years
Read more